Blog

Video case study - Wind turbine production is stalled

Jim Riley

1st May 2009

A super video to use at various stages for an AS or A2 SOW. The world’s largest wind turbine manufacturer (Vestas) is considering closing its wind turbine blade factory on the Isle of Wight due to a lack of future orders - despite wind power being perceived as a high growth market! Great for considering the nature of investment in capacity, the effect of factory closure on a local community and topics too!

Download student worksheet (including video link)

Jim Riley

Jim co-founded tutor2u alongside his twin brother Geoff! Jim is a well-known Business writer and presenter as well as being one of the UK's leading educational technology entrepreneurs.

You might also like

© 2002-2024 Tutor2u Limited. Company Reg no: 04489574. VAT reg no 816865400.